Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 8 SEPTEMBER 2025

Lochee Road (at Smellies Lane) – stop/go traffic control for one week for bollard upgrade works.

Shaftesbury Park – road closure for 5 days from Monday 8 September for carriageway resurfacing.

West Marketgait – closed northbound between Greenmarket and Nethergate on Sunday 14 September for one day for road defect repairs.

Forthcoming Roadworks

Riverside Avenue (near Wright Avenue) – temporary traffic lights from Monday 15 September for 2 weeks for Network Rail work.

Monday, 1 September 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 1 SEPTEMBER 2025

Park Street – closed from 9.00am on Monday 1 September to 6.00am on Tuesday 2 September for Scottish Water work.

Lochee Road (at Park Street) – temporary traffic lights from 9.00am on Monday 1 September to 6.00am on Tuesday 2 September for Scottish Water work.

Lochee Road (at Smellies Lane) – stop/go traffic control for 2 weeks from Monday 1 September for bollard upgrade works.

Forthcoming Roadworks

West Marketgait – closed northbound between Greenmarket and Nethergate on Sunday 14 September for one day for road defect repairs.

Riverside Avenue (near Wright Avenue) – temporary traffic lights from Monday 15 September for 2 weeks for Network Rail work.

Monday, 25 August 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 25 AUGUST 2025

Blinshall Street (at Douglas Street) – road closure from Monday 25 August for 5 days for carriageway patching works.

Fyffe Street (at Polepark Road) - road closure from Monday 25 August for 5 days for carriageway patching works.

Forthcoming Roadworks

Lochee Road (at Park Street) – temporary traffic lights from 9.00am on Monday 1 September to 6.00am on Tuesday 2 September for Scottish Water work.

Riverside Avenue (near Wright Avenue) – temporary traffic lights from Monday 15 September for 2 weeks for Network Rail work.

Monday, 18 August 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL - WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 18 AUGUST 2025

Strawberrybank – closed from Thursday 14 August for one week for Scottish Water work.

[We have had exchanges with a council roads engineer about this and the closure may not be required or only for part of the period].

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks :

  • Ancrum Road (at Peel Street) – temporary traffic lights until Wednesday 20 August

[We have been advised by SSEN :  “Wood (the contractors) were on track to reinstate and remove the traffic management for Sunday (17/8/25), opening the road up to traffic as promised.   However recent heavy rainfall scuppered their plans..  They will now have to dig out a large portion of the back fill and repeat the reinstatement - we can’t take the risk of the sodden backfill sinking. They now expect to be tarring on Wednesday 20/8/25, road should be open by 21/8/25.]

Perth Road at No 20 Braes Bar - temporary traffic lights from Monday 18 August for 5 days for SSEN works.

Lochee Road (at Smellies Lane) – temporary traffic lights from 9.00am on Thursday 21 August to 6.00am on Friday 22 August for Scottish Water work.

Forthcoming Roadworks

Blinshall Street (at Douglas Street) – road closure from Monday 25 August for 5 days for carriageway patching works.

Fyffe Street (at Polepark Road) - road closure from Monday 25 August for 5 days for carriageway patching works.

Park Street – closed from 9.00am on Monday 1 September to 6.00am on Tuesday 2 September for Scottish Water work.

Lochee Road (at Park Street) – temporary traffic lights from 9.00am on Monday 1 September to 6.00am on Tuesday 2 September for Scottish Water work.

Riverside Avenue (near Wright Avenue) – temporary traffic lights from Monday 15 September for 2 weeks for Network Rail work.

Sunday, 17 August 2025

Tram at Ninewells #dundeewestend


With thanks to Bert Ritchie and Dundonian History for All, a fabulous historic photograph of a tram at Ninewells.

Monday, 11 August 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR WEEK COMMENCING MONDAY 11 AUGUST 2025

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks:

  • Ancrum Road (at Peel Street) – temporary traffic lights for one week

A90 Kingsway West (at Myrekirk roundabout) – overnight (7.30pm to 5.30am) northbound lane closure on Monday 11 August for Street Lighting work.

Perth Road (at Rockfield Street) – temporary traffic lights on Tuesday 12 and Wednesday 13 August for Scottish Water work.

Forthcoming Roadworks

Lochee Road (at Smellies Lane) – temporary traffic lights from 9.00am on Thursday 21 August to 6.00am on Friday 22 August for Scottish Water work.

Blinshall Street (at Douglas Street) – road closure from Monday 25 August for 5 days for carriageway patching works.

Fyffe Street (at Polepark Road) - road closure from Monday 25 August for 5 days for carriageway patching works.

Park Street – closed from 9.00am on Monday 1 September to 6.00am on Tuesday 2 September for Scottish Water work.

Lochee Road (at Park Street) – temporary traffic lights from 9.00am on Monday 1 September to 6.00am on Tuesday 2 September for Scottish Water work.

Monday, 4 August 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR WEEK COMMENCING MONDAY 4 AUGUST 2025

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks:

  • Ancrum Road (at Peel Street) – temporary traffic lights for 2 weeks;
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for one week
  • [Please see our previous Facebook posts regarding the delays to this].

Blackness Road (at Glenagnes Road) – temporary traffic lights Tuesday 5 August for 2 weeks for Scottish Water work.

Forthcoming Roadworks

Perth Road (at Rockfield Street) – temporary traffic lights on Tuesday 12 and Wednesday 13 August for Scottish Water work.

Lochee Road (at Smellies Lane) – temporary traffic lights from 9.00am on Thursday 21 August to 6.00am on Friday 22 August for Scottish Water work.

Blinshall Street (at Douglas Street) – road closure from Monday 25 August for 5 days for carriageway patching works.

Fyffe Street (at Polepark Road) - road closure from Monday 25 August for 5 days for carriageway patching works.

Saturday, 26 July 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - SATURDAY 26 AND SUNDAY 27 JULY 2025

Nethergate (at Seabraes) – temporary traffic lights from Wednesday 23 to Tuesday 29 July for BT work.

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 28 JULY 2025

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks:

  • Ancrum Road (at Peel Street) – temporary traffic lights for 3 weeks;
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 2 weeks

[Please see our previous Facebook posts regarding the delays to this].

Jedburgh Road – closed from Monday 21 July for 7 days for carriageway resurfacing.

Riverside Avenue – road closed from its junction with Kingsway/Swallow Roundabout for a distance of 500m in a south westerly direction to its junction with Apollo Way.  Closed for 5 evenings between 7.00pm and 7.00am commencing Monday 21 July for carriageway resurfacing works.

City Road (at Friary Gardens) – temporary traffic lights on Monday 28 July (9.00am to midnight) for Scottish Water work.

Forthcoming Roadworks

Blackness Road (at Glenagnes Road) – temporary traffic lights Tuesday 5 August for 2 weeks for Scottish Water work.

Blackness Road (at Glenagnes Road) – temporary traffic lights from Tuesday 19 August for 10 days for Scottish Water work.

Lochee Road (at Smellies Lane) – temporary traffic lights from 9.00am on Thursday 21 August to 6.00am on Friday 22 August for Scottish Water work.

Blinshall Street (at Douglas Street) – road closure from Monday 25 August for 5 days for carriageway patching works.

Monday, 21 July 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 21 JULY 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks:

  • Ancrum Road (at Peel Street) – temporary traffic lights for 3 weeks; and
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 4 weeks.

[Please see our previous Facebook posts regarding the delays to this].

Jedburgh Road – closed from Monday 21 July for 7 days for carriageway resurfacing.

Riverside Avenue – road closed from its junction with Kingsway/Swallow Roundabout for a distance of 500m in a south westerly direction to its junction with Apollo Way.  Closed for 5 evenings between 7.00pm and 7.00am commencing Monday 21 July for carriageway resurfacing works.

Lochee Road (at Smellies Lane) – temporary traffic lights from Thursday 24 July for 2 days for Scottish Water work.

Smellies Lane – closed from Thursday 24 July for 2 days for Scottish Water work.

Forthcoming Roadworks

City Road (at Friary Gardens) – temporary traffic lights on Monday 28 July (9.00am to midnight) for Scottish Water work.

Blackness Road (at Glenagnes Road) – temporary traffic lights from Tuesday 19 August for 10 days for Scottish Water work.

Saturday, 12 July 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 14 JULY 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks:

  • Ancrum Road (at Peel Street) – temporary traffic lights for 4 weeks; and
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 5 weeks.
  • [Please see our previous Facebook posts regarding the delays to this].

Blackness Road (at Hyndford Street) – temporary traffic lights from 9.00am on Thursday 17 July to 6.00am on Friday 18 July for Scottish Water work.

Blackness Road (at Balgay Road) – temporary traffic lights from 9.00am on Friday 18 July to 6.00am on Saturday 19 July for Scottish Water work.

Forthcoming Roadworks

Jedburgh Road – closed from Monday 21 July for 7 days for carriageway resurfacing.

  • [Please see our previous Facebook post regarding the delays to this – the works also include Kelso Street and Kelso Place].

Riverside Avenue  - road fully closed from its junction with Kingsway/Swallow Roundabout for a distance of 500m in a south westerly direction to its junction with Apollo Way. Closed for 5 evenings between 19:00 and 07:00 commencing 21st July for carriageway resurfacing works.

Lochee Road (at Smellies Lane) – temporary traffic lights on Thursday 24 July for 2 days for Scottish Water work.

Smellies Lane – closed from Thursday 24 July for 2 days for Scottish Water work.

City Road (at Friary Gardens) – temporary traffic lights on Monday 28 July (9.00am to midnight) for Scottish Water work.

Saturday, 5 July 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL - WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - SATURDAY 5 AND SUNDAY 6 JULY 2025

Strawberrybank (at Perth Road) – closed for one week for Scottish Water work.

[Note from Fraser and Michael – we have queried this as we are aware of what appears to be Scottish Water emergency work but residents are asking the need for this length of closure as there was no work on-site parts of Thursday and Friday.    Scottish Water has advised it will prioritise the work today - sett reinstatement - and hopefully the closure will therefore be lifted soon.]

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 7 JULY 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks insofar as it affects the West End Ward :

  • Ancrum Road (at Peel Street) – temporary traffic lights for 5 weeks; and
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 6 weeks.

[Note from Fraser and Michael – the road report information is provided by the City Council. We queried the over-run of this project and the lights on Ancrum Road and westbound closure on Tullideph Road. This has been caused we understand by issues between SSEN and its contractor over the jointing phase of the work.   Please see our latest update about the delays at http://tiny.cc/Ancrum-Tullideph which indicate the work will not be completed until 10th to 17th August.]

Blackness Road (at Glenagnes Road) - temporary traffic lights for one week for Scottish Water work.

Hawkhill (at Hunter Street) – temporary traffic lights from Wednesday 9 July for 2 days for Scottish Water work.

Forthcoming Roadworks

Blackness Road (at Hyndford Street) – temporary traffic lights from 9.00am on Thursday 17 July to 6.00am on Friday 18 July for Scottish Water work.

Blackness Road (at Balgay Road) – temporary traffic lights from 9.00am on Friday 18 July to 6.00am on Saturday 19 July for Scottish Water work.

Jedburgh Road – closed from Monday 21 July for 7 days for carriageway resurfacing.

Lochee Road (at Smellies Lane) – temporary traffic lights on Thursday 24 July for 2 days for Scottish Water work.

Smellies Lane – closed from Thursday 24 July for 2 days for Scottish Water work.

City Road (at Friary Gardens) – temporary traffic lights on Monday 28 July (9.00am to midnight) for Scottish Water work.

Monday, 30 June 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 30 JUNE 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks insofar as it affects the West End Ward :

  • Ancrum Road (at Peel Street) – temporary traffic lights for 7 weeks; and
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 7 weeks.

[Note from Fraser and Michael – the road report information is provided by the City Council. We queried the over-run of this project and the lights on Ancrum Road and westbound closure on Tullideph Road. This has been caused we understand by issues between SSEN and its contractor over the jointing phase of the work. We have been assured that the work will be completed by 7th July. We wrote to SSEN about the delays].

Blackness Road (at Glenagnes Road) - temporary traffic lights from Monday 30 June for 2 weeks for Scottish Water work.

Milnbank Road (at Polepark Road) – closed from Monday 30 June for 3 days for joint fill/lining works.

Ninewells Avenue (between Ninewells Drive and Dickson Avenue) – closed from Thursday 3 July for 3 days for joint fill/lining works.

Forthcoming Roadworks

Hawkhill (at Hunter Street) – temporary traffic lights from Wednesday 9 July for 2 days for Scottish Water work.

Blackness Road (at Hyndford Street) – temporary traffic lights from 9.00am on Thursday 17 July to 6.00am on Friday 18 July for Scottish Water work.

Blackness Road (at Balgay Road) – temporary traffic lights from 9.00am on Friday 18 July to 6.00am on Saturday 19 July for Scottish Water work.

Jedburgh Road – closed from Monday 21 July for 7 days for carriageway resurfacing.

Lochee Road (at Smellies Lane) – temporary traffic lights on Thursday 24 July for 2 days for Scottish Water work.

Smellies Lane – closed from Thursday 24 July for 2 days for Scottish Water work.

City Road (at Friary Gardens) – temporary traffic lights on Monday 28 July (9.00am to midnight) for Scottish Water work.

Monday, 23 June 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 23 JUNE 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks insofar as it affects the West End Ward :

  • Ancrum Road (at Peel Street) – temporary traffic lights for 2 weeks; and
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 2 weeks.

[Note from Fraser and Michael – the road report information is provided by the City Council. We queried the over-run of this project and the lights on Ancrum Road and westbound closure on Tullideph Road. This has been caused we understand by issues between SSEN and its contractor over the jointing phase of the work. We have been assured that the work will be completed by 7th July. We wrote to SSEN about the delays].

Perth Road (at Farington Street) – temporary traffic lights on Tuesday 24 June for BT work.

Blackness Avenue (at Shaftesbury Terrace) – temporary traffic lights from 9.00am to midnight on Wednesday 25 June for Scottish Water work.

Glamis Road (at Blackness Road) – temporary traffic lights from 9.00am on Wednesday 25 June to 6.00am on Thursday 26 June for Scottish Water work.

Riverside Esplanade – nearside westbound lane closure from 9.00am on Wednesday 25 June to 6.00am on Thursday 26 June for Scottish Water work.

Forthcoming Roadworks

Blackness Road (at Glenagnes Road) - temporary traffic lights from Monday 30 June for 2 weeks for Scottish Water work.

Milnbank Road (at Polepark Road) – closed from Monday 30 June for 3 days for joint fill/lining works.

Ninewells Avenue – closed from Thursday 3 July for 3 days for joint fill/lining works.

Hawkhill (at Hunter Street) – temporary traffic lights from Wednesday 9 July for 2 days for Scottish Water work.

Tuesday, 17 June 2025

West End weekly ward surgeries tonight #dundeewestend


Our West End surgeries take place later today.

This week, they are as follows :

Blackness Library (Tuesdays 5pm – every week during school term time)

West End Campus (come to reception area of St Joseph's RC PS and Victoria Park PS) – (3rd Tuesday of each month at 5.45pm during school term time)

All welcome - no appointment needed!

Monday, 16 June 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 16 JUNE 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks insofar as it affects the West End Ward:

  • Ancrum Road (at Peel Street) – temporary traffic lights for 4 weeks; and
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 4 weeks.

[Note from Fraser and Michael – the road report information is provided by the City Council.    We have queried the over-run of this project and the lights on Ancrum Road and westbound closure on Tullideph Road.   This has been caused we understand by issues between SSEN and its contractor over the jointing phase of the work.    We have been assured that the work will be completed by 7th July.    We have written to SSEN about the delays].

Park Place – give and take traffic control for 2 weeks from Monday 16 June for lighting works.

Forthcoming Roadworks

Perth Road (at Farington Street) – temporary traffic lights on Tuesday 24 June for BT work.

Blackness Avenue (at Shaftesbury Terrace) – temporary traffic lights from 9.00am to midnight on Wednesday 25 June for Scottish Water work.

Glamis Road (at Blackness Road) – temporary traffic lights from 9.00am on Wednesday 25 June to 6.00am on Thursday 26 June for Scottish Water work.

Riverside Esplanade – nearside westbound lane closure from 9.00am on Wednesday 25 June to 6.00am on Thursday 26 June for Scottish Water work.

Blackness Road (at Glenagnes Road) - temporary traffic lights from Monday 30 June for 2 weeks for Scottish Water work.

Milnbank Road (at Polepark Road) – closed from Monday 30 June for 3 days for joint fill/lining works.

Ninewells Avenue – closed from Thursday 3 July for 3 days for joint fill/lining works.

Hawkhill (at Hunter Street) – temporary traffic lights from Wednesday 9 July for 2 days for Scottish Water work.

Monday, 9 June 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL - WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 9 JUNE 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks insofar as it affects the West End Ward :

Ancrum Road (at Peel Street) – temporary traffic lights for 4 weeks; and

Tullideph Road (City Road to Greenbank Place) – closed westbound for 4 weeks.

[Note from Fraser and Michael – the road report information is provided by the City Council.    We have queried the over-run of this project and the lights on Ancrum Road and westbound closure on Tullideph Road.   This has been caused we understand by issues between SSEN and its contractor over the jointing phase of the work.    We have been assured that the work will be completed by 7th July.    We have written to SSEN about the delays].

Park Place – give and take traffic control for 3 weeks from Monday 9 June for lighting works.

Douglas Street (east of Blinshall Street) – closed from Friday 6 June for 4 days for water connection works.

Cross Lane – temporary traffic lights Monday 9 June for 3 days for Environmental Technique work.

Forthcoming Roadworks

Perth Road (at Farington Street) – temporary traffic lights on Tuesday 24 June for BT work.

Blackness Avenue (at Shaftesbury Terrace) – temporary traffic lights from 9.00am to midnight on Wednesday 25 June for Scottish Water work.

Glamis Road (at Blackness Road) – temporary traffic lights from 9.00am on Wednesday 25 June to 6.00am on Thursday 26 June for Scottish Water work.

Riverside Esplanade – nearside westbound lane closure from 9.00am on Wednesday 25 June to 6.00am on Thursday 26 June for Scottish Water work.

Blackness Road (at Glenagnes Road) - temporary traffic lights from Monday 30 June for 2 weeks for Scottish Water work.

Milnbank Road (at Polepark Road) – closed from Monday 30 June for 3 days for joint fill/lining works.

Ninewells Avenue – closed from Thursday 3 July for 3 days for joint fill/lining works.

Hawkhill (at Hunter Street) – temporary traffic lights from Wednesday 9 July for 2 days for Scottish Water work.

Monday, 2 June 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 2 JUNE 2025

Shaftesbury Road (Hyndford Street to Seymour Street) – closed from Wednesday 21 May for 2 weeks for Scottish Water work.

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks insofar as it affects the West End Ward :

  • Ancrum Road (at Peel Street) – temporary traffic lights for 7 weeks; and
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 7 weeks.

Park Place – give and take traffic control for 4 weeks Monday 02 June for lighting works.

Perth Road (at Westfield Lane) – temporary traffic lights from Monday 2 June for 5 days for Scottish and Southern Energy Network work.

Douglas Street (east of Blinshall Street) – closed from Friday 6 June for 4 days for water connection works.

Forthcoming Roadworks

Cross Lane – temporary traffic lights Monday 9 June for 3 days for Environmental Technique work.

Perth Road (at Farington Street) – temporary traffic lights on Tuesday 24 June for BT work.

Blackness Avenue (at Shaftesbury Terrace) – temporary traffic lights from 9.00am to midnight on Wednesday 25 June for Scottish Water work.

Blackness Road (at Glenagnes Road) - temporary traffic lights from Monday 30 June for 2 weeks for Scottish Water work.

Saturday, 24 May 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - SATURDAY 24 AND SUNDAY 25 MAY 2025

Shaftesbury Road (Hyndford Street to Seymour Street) – closed from Wednesday 21 May for 2 weeks for Scottish Water work.

Hillcrest Road (at Marchfield Road) – closed for one week for Scottish Water work.

Blackness Road (at Marchfield Road) – temporary traffic lights for one week for Scottish Work.

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 26 MAY 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Brown Street (south of Douglas Street) - closed until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks insofar as it affects the West End Ward :

  • Ancrum Road (at Peel Street) – temporary traffic lights for 8 weeks; and
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 8 weeks.

Park Place – give and take traffic control for 5 weeks from Monday 26 May for lighting works.

Magdalen Yard Road - closed westbound on Sunday 1 June (8.00am and 9.00pm) between Thomson Street and Windsor Street for the West Fest Music Festival.

Forthcoming Roadworks

Perth Road (at Westfield Lane) – temporary traffic lights from Monday 2 June for 5 days for Scottish and Southern Energy Network work.

Perth Road (at Farington Street) – temporary traffic lights on Wednesday 11 June for BT work.

Blackness Avenue (at Shaftesbury Terrace) – temporary traffic lights from 9.00am to midnight on Wednesday 25 June  for Scottish Water work.

Blackness Road (at Glenagnes Road) - temporary traffic lights from Monday 30 June for 2 weeks for Scottish Water work.

Monday, 19 May 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR THE WEST END WARD - WEEK COMMENCING MONDAY 19 MAY 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Brown Street (south of Douglas Street) - closed until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 19 weeks insofar as it affects the West End Ward :

  • Ancrum Road (at Peel Street) – temporary traffic lights for 9 weeks;
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 9 weeks

Ashbank Road and Glenagnes Street – closed from Monday 19 May for 5 days for carriageway resurfacing works.  Areas affected – Ashbank Road from its junction with Blackness Road to its junction with Logie Avenue and Glenagnes Street from its junction with Birchwood Place to its junction with Lime Street.

Riverside Drive (at airport) – temporary traffic lights on Friday 23 May for Scottish Water work.

Forthcoming Roadworks

Park Place – give and take traffic control for 5 weeks from Monday 26 May for lighting works.

Magdalen Yard Road - closed westbound on Sunday 1 June (8.00am and 9.00pm) between Thomson Street and Windsor Street for the West Fest Music Festival.

Perth Road (at Westfield Lane) – temporary traffic lights from Monday 2 June for 5 days for Scottish and Southern Energy Network work.

Perth Road (at Farington Street) – temporary traffic lights on Wednesday 11 June for BT work.

Monday, 12 May 2025

Weekly Road Report – West End Ward #dundeewestend


DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR WEEK COMMENCING MONDAY 12 MAY 2025

Blinshall Street (Douglas Street to 50 metres south) - closed until August 2025 for construction works.

Douglas Street (Blinshall Street to Brown Street) - temporary traffic lights until August 2025 for construction works.

Brown Street (south of Douglas Street) - closed until August 2025 for construction works.

Scottish and Southern Energy Networks Elmwood Cable Renewal Scheme - temporary traffic lights and road closure from Tuesday 4 March for 12 weeks insofar as it affects the West End Ward :

  • Ancrum Road (at Peel Street) – temporary traffic lights for 10 weeks;
  • Tullideph Road (City Road to Greenbank Place) – closed westbound for 10 weeks

Explorer Road (Mallaig Avenue for 70m in a westerly direction) – closed eastbound from Monday 12 May for 3 weeks for sewer connection.

West Marketgait (southbound from Hawkhill to Nethergate) – lane closure from Tuesday 13 May for 3 nights (9.00pm to 5.00am) for crane lifting operations.

Forthcoming Roadworks

Ashbank Road and Glenagnes Street – closed from Monday 19 May for 5 days for carriageway resurfacing works.  Areas affected – Ashbank Road from its junction with Blackness Road to its junction with Logie Avenue and Glenagnes Street from its junction with Birchwood Place to its junction with Lime Street.

Park Place – give and take traffic control for 5 weeks from Monday 26 May for lighting works.

Magdalen Yard Road - closed westbound on Sunday 1 June (8.00am and 9.00pm) between Thomson Street and Windsor Street for the WestFest Music Festival.